Flood Protection (DAM)
Procurement strategy: according to FIDIC Red Book
The site of the Central Wastewater Treatment Plant was a flood reservoir before starting the construction. In order to ensure flood prevention of the Plant, a flood prevention line of 1.5 meter average height, 1250 m length, and approximately 8 m width will have to be built by the contractor to be selected in the frame of a public procurement procedure.
The planned date of the public procurement procedure (Publication of the Call for Tender): September 2006