Access Road (ROA)
Procurement strategy: according to FIDIC Red Book
A two-lane road of approximately 282 m for the operation and the logistical tasks of the Central Wastewater Treatment Plant will have to be built to be connected to Szabadkikötő út.
The access road includes the construction of an underpass of 30 meters and the related bridge structure below the existing line of the suburban railway (HÉV), which is also the current flood prevention line.
The planned date of initiating the public procurement procedure (Date of publication of the Call for Tender): April 2007